2026 Construction Bidding: Material & Labor Cost Trends to Price Jobs Profitably
- Cost Construction Accounting
- 2 days ago
- 8 min read
It's late November 2025. You're pricing a commercial renovation project breaking ground in March 2026. You pull up your estimating spreadsheet, the same one you've used all year and start plugging in costs.
But here's the dangerous question: Are those numbers still accurate?
If you're bidding 2026 projects using mid-2025 cost data, you're gambling with your margins. Material prices have shifted. Labor markets have changed. Hidden costs like insurance and fuel have crept upward. And if your job costing system isn't capturing these changes, you're likely winning bids that will lose money.
The fourth quarter is planning season for construction. The bids you submit now determine your profitability for the first half of 2026. This article breaks down late 2025 cost trends and shows you how to optimize job costing to bid competitively without sacrificing margins.

Late 2025 Material Cost Snapshot
Lumber & Wood Products: Stabilization After Volatility
After years of dramatic swings, lumber markets have found relative stability in late 2025. Framing lumber prices hover near $425-$475 per thousand board feet close to historical averages.
2026 Outlook:Â Expect modest increases of 3-5% through the first half. The wild 50-100% price swings of recent years are unlikely unless major supply disruptions occur.
Bidding Implications:Â For projects starting Q2-Q3 2026, add a 4-6% material escalation factor. West Coast markets continue seeing 8-12% premiums over Midwest and Southeast pricing.
Concrete, Cement & Aggregates: Upward Pressure Continues
Unlike lumber, concrete materials have seen steady upward pricing through 2025 with no signs of reversal.
Current Trends:
Ready-mix concrete up 6-8% year-over-year in most markets
Portland cement costs increased 7-10% due to energy costs
Aggregates risen 5-7% in urban markets
2026 Outlook:Â Expect another 4-6% increase through 2026. Coastal areas and dense urban centers will see higher increases potentially 8-10%.
Bidding Implications:Â Don't use Q2 2025 concrete prices for Q2 2026 projects, you could be 12-15% low. Get current quotes from suppliers and build in escalation for extended timelines.
Steel & Metal Products: Volatility with Downward Bias
Steel markets have experienced significant volatility in 2025, with late-year prices trending slightly downward.
Current Pricing:
Hot-rolled steel coil: $700-$775 per ton (down from $850-$900 early 2025)
Rebar: $625-$675 per ton (relatively stable)
Fabricated structural steel: Down 5-8% from early 2025 peaks
Critical Issue: Lead Times While prices softened, fabrication lead times remain extended at 12-16 weeks in many markets up from 8-10 weeks historically. Custom work can extend to 20+ weeks.
Bidding Implications:Â Steel prices are favorable, but lead time risk is significant. Lock in pricing early and build contingencies for schedule delays caused by fabrication bottlenecks.
Electrical & Mechanical: Supply Chain Normalization
After years of pandemic-related shortages, electrical and mechanical materials have largely normalized in late 2025.
Current Status:
Electrical wire and cable prices stable
Breaker panels and switchgear lead times back to 6-8 weeks
HVAC equipment pricing stable
Plumbing materials up modestly (3-4%)
2026 Outlook:Â Expect continued stability with inflation-level increases (2-4%). This category is reliable for 2026 planning focus escalation concerns on concrete, labor, and fuel instead.
Labor Market Reality Check
The Skilled Labor Shortage Persists
The construction industry still has approximately 250,000-300,000 unfilled positions nationwide. Certain trades face acute shortages:
Tightest Labor Markets:
Electricians: Severe shortage driving wage premiums
HVAC Technicians: High demand from construction and service sectors
Plumbers: Aging workforce with insufficient new apprentices
Welders/Ironworkers: Critical shortage for steel projects
Wage Pressure by Trade
Average hourly rates (including benefits and burden) in late 2025:
Electricians (Journeyman):Â $45-$65/hour (up 6-8% from 2024)
Plumbers (Journeyman):Â $42-$58/hour (up 5-7%)
Carpenters (Skilled):Â $38-$52/hour (rough vs. finish)
HVAC Technicians:Â $40-$55/hour
General Laborers:Â $18-$28/hour (relatively stable)
Critical Point:Â In overheated markets (major data centers, large industrial projects), skilled trades can command 20-30% premiums as contractors compete for limited workforce.
The Overtime Cost Trap
In late 2025's tight labor market, many projects run behind schedule. To make up time, you're paying time-and-a-half or double-time. But did your estimate account for 15-20% of hours at premium rates?
Example: You estimated 1,000 electrical hours at $50/hour = $50,000. Reality: 850 hours straight time ($42,500) + 150 overtime hours at $75/hour ($11,250) = $53,750. That's a 7.5% overrun potentially wiping out your entire profit margin.
Bidding Implications:Â For projects with aggressive schedules, build in 10-15% of labor hours at overtime rates. Don't assume perfect productivity.
Labor Burden Increases: The Hidden Killer
Your field labor rate isn't just wages. It includes payroll taxes, workers' comp, general liability, health insurance, retirement, PTO, and unemployment insurance.
What Changed in 2025:
Workers' comp rates up 8-12% in many states
General liability insurance up 10-15%
Health insurance costs rose 6-8%
Real Numbers:Â If you pay an electrician $45/hour in wages, your true loaded cost (with full burden) is likely $62-$70/hour. That's a 38-55% burden rate.
Many contractors underbid because they're using burden rates from 2-3 years ago. If your burden was 35% in 2023 and it's actually 45% now, you're losing 7-8% on every labor dollar.
Bidding Implications:Â Recalculate labor burden rates EVERY YEAR with actual insurance quotes and benefits costs.
The Hidden Costs Crushing Margins
Fuel and Equipment Costs
Diesel averaged $3.80-$4.20/gallon through late 2025. Equipment rental rates continued climbing 5-8% in 2025. Specialty equipment (large excavators, cranes, aerial lifts) is up 10-12% in tight markets.
Bidding Implications:Â Get current rental quotes for every bid, don't use old estimates.
Insurance Premium Increases
This is the silent margin killer for 2025-2026.
General Liability:Â Up 10-15% for most contractors
Workers' Compensation:Â Up 8-12% in most states
Commercial Auto:Â Up 12-18%
Umbrella Policies:Â Up 15-20%
Real Impact:Â If insurance represents 4-5% of revenue and premiums increase 12%, that's an additional 0.5-0.6% of revenue consumed. On $2 million annual revenue, that's $10,000-$12,000 in reduced profit.
Bidding Implications:Â Recalculate overhead burden with current insurance costs annually.
Extended Project Timelines
Projects take longer in late 2025 due to labor shortages, material delays, complex permitting, and weather disruptions. Longer timelines mean extended general conditions, more supervision hours, additional equipment rental, and increased escalation risk.
Bidding Implications:Â Build realistic schedules with buffer time. Every extra month on-site costs money.
How to Optimize Job Costing for 2026 Bids
1. Update Your Cost Database Quarterly
Your estimating system should reflect current conditions, not historical data.
Action Steps:
Review material costs quarterly (monthly for volatile items)
Update labor rates semi-annually at minimum
Recalculate labor burden rates annually with actual costs
Refresh equipment rental rates before major bids
Best Practice:Â Create a "cost review date" field in your software. Flag items older than 6 months for verification before use.
2. Negotiate Supplier Price Agreements
Don't rely on spot pricing lock in costs wherever possible.
Strategies:
Negotiate annual agreements with major suppliers
Get written quotes valid for 60-90 days for material packages
For projects bidding now but starting Q2 2026, negotiate pricing with delayed purchase dates
Consider vendor relationships offering price protection
3. Build in Appropriate Contingencies
Contingencies aren't padding, they're realistic risk management.
Recommended Contingency Structure for 2026:
Material Escalation:
Projects starting Q1 2026: 2-3%
Projects starting Q2-Q3 2026: 4-6%
Projects starting Q4 2026 or later: 6-8%
Labor Cost Escalation:
Projects under 6 months: 2-3%
Projects 6-12 months: 4-6%
Projects over 12 months: 7-10%
Critical Point:Â If owners won't accept escalation clauses, you MUST build contingencies into your base bid price.
4. Improve Real-Time Job Cost Tracking
Estimating is half the equation. You need real-time job cost tracking to catch problems before they destroy margins.
Weekly Cost Updates (Not Monthly)Â Most contractors review job costs monthly when closing books. That's too late. By the time you realize a project is 15% over budget on labor, you've lost weeks of corrective opportunity.
Best Practice:
Update job costs weekly for active projects
Compare actual to estimates every week
Investigate any variance over 5% immediately
Adjust field operations before small overruns become large losses
Early Warning Indicators:
Labor hours exceeding estimate by 5%+ at 25% completion
Material costs tracking 10%+ over budget
Schedule slipping more than 1 week on projects under 3 months
Any category showing consistent weekly overruns
5. Use Historical Data to Refine Estimates
Your completed projects are estimating intelligence gold mines.
Mine Completed Job Data:
Calculate actual cost per square foot by building type
Analyze actual labor productivity rates
Review material waste factors
Track subcontractor markup reality
Action Step:Â After every completion, schedule a 30-minute "lessons learned" review documenting estimate variances and causes. Update your estimating database with findings.
Identify Cost Overrun Patterns Pull reports from the past 24 months. Categorize overruns by phase. Identify which phases consistently overrun 10%+ and adjust estimating factors accordingly.
6. Use Accounting Data Strategically
Your monthly financial reports can improve bids if you actually use them.
Benchmark Gross Profit by Project Type:Â Analyze gross profit percentage by project type, project size, and client type. Focus 2026 business development on project types where you consistently deliver strong margins.
Track Overhead Percentage Trends:Â If overhead as a percentage of revenue is increasing (from 12% to 15% to 18%), you must either cut overhead or increase pricing on new bids.
Calculate Break-Even Revenue Formula:
Break-Even Revenue = Annual Overhead ÷ (1 - Direct Cost %) |
Make sure your backlog supports revenue well above break-even (ideally 150-200% for healthy profitability).
Red Flags Your Job Costing System Is Failing
Consistent estimate vs. actual variances (10-15% + overruns)
Inability to track costs by project phase
Delayed cost recognition (only when bills are paid)
No comparison to original estimates
Missing indirect cost allocation (supervision, equipment, consumables)
Your 30-Day Action Plan for 2026
Week 1: Cost Database Audit
Review every material cost. Flag items older than 6 months. Get current quotes for top 20 materials. Update estimating database.
Week 2: Labor Rate Review
Recalculate labor burden with current insurance costs. Update field rates by trade. Verify subcontractor rates. Adjust productivity factors based on last 12 months.
Week 3: Historical Analysis
Pull completed job cost reports for past 12 months. Calculate actual gross profit by type. Identify phases with consistent overruns. Document lessons learned.
Week 4: System Implementation
Implement a weekly job cost review process. Set up variance alerts. Train estimators on an updated database. Develop escalation contingency guidelines.
The Bottom Line
Optimizing job costing isn't about complicated software or expensive consultants. It's about systematically tracking costs, comparing actuals to estimates, and continuously refining your database based on real field performance.
In late 2025's cost environment with material volatility, labor shortages, and hidden cost pressures, contractors who treat estimating as one-time activity will lose money on 2026 projects. Those who treat job costing as ongoing management discipline will bid competitively while protecting margins.
The difference between winning profitable work and winning work that loses money comes down to accurate, current, construction-specific financial data.
That's exactly what Construction Cost Accounting delivers.
We specialize in construction bookkeeping with focus on job costing systems that help you bid better:
Monthly job cost reports comparing estimates to actuals
Phase-level cost tracking identifying overruns early
Gross profit analysis by project type guiding business development
Financial data integration with your estimating system
Overhead calculation and break-even analysis
Whether you're preparing 2026 bids or understanding why 2025 projects didn't deliver expected margins, our team can help you build the job costing foundation that drives profitability.
Ready to bid smarter in 2026? Contact Construction Cost Accounting today to schedule a consultation. Let's turn your financial data into a competitive advantage.
