How WIP Reports Impact Bonding Capacity: A Guide for Contractors
- Cost Construction Accounting

- Oct 28
- 5 min read
If your bonding agent has recently requested updated Work-in-Progress (WIP) reports, you may be feeling the pressure. It’s understandable to be concerned about how these reports could impact your bonding capacity, especially if you’re unsure about exactly what the underwriters are looking for. For small and mid-sized contractors (SMEs), your bonding capacity is essential. It's the difference between competing for multi-million dollar projects or staying in the smaller leagues. With your bonding line at stake, it's crucial to ensure your WIP reports meet the underwriters' expectations.

In this Article:
Why WIP Reports Matter for Bonding
Your WIP report is more than just a snapshot of your current projects. It’s a tool that underwriters use to assess the financial health of your business. The surety’s primary goal is risk management. They need to be confident that you have enough financial control to complete your projects without running out of cash or suffering significant losses. Here's why WIP reports are critical:
What WIP Shows vs. Other Reports:
The Balance Sheet shows your overall financial position at a single point in time, but it doesn't provide real-time insights into your ongoing projects.
The Profit & Loss (P&L) statement shows your historical performance, detailing what happened in the past quarter or year.
WIP shows each project’s current health, including expected profits, potential losses, and cash flow status. This makes WIP the most critical document for bonding.
Real-Time Financial Insights:
Sureties are looking for up-to-date data that shows exactly how well you’re managing your projects. The more accurate and consistent your WIP reports, the more confident the surety will be in your ability to deliver on projects. Inconsistent data or late reports can raise red flags, signaling poor financial control.
What Surety Underwriters Are Looking for in Your WIP Reports
Surety underwriters review your WIP report to assess several factors that indicate your ability to manage project finances effectively. Below are the six primary areas they focus on:
Accuracy and Consistency of Calculations
Underwriters need to see that your calculations, especially the Percentage of Completion (POC), are applied consistently and based on real data. If your WIP shows that a project is 50% complete but you've billed 80% of the contract value, it raises concerns. The underwriter may view this as front-loading revenue, which can result in cash flow issues down the road. They prefer to see that billings and completion percentages align with actual work done, avoiding overly optimistic forecasts.
Profitability and Profit Fade
Underwriters will closely examine the Gross Profit Margins of each project. The primary thing they are looking for is Profit Fade does your profit on a project decrease as the project progresses? If you start with high-profit margins but find them shrinking as the job nears completion, this could indicate poor project management, inaccurate estimates, or insufficient cost controls. It’s important to identify and address profit fade early, as this could signal financial risks.
Billing Position: Overbilling vs. Underbilling
Overbilling and underbilling provide a snapshot of your cash flow practices. Overbilling, billing more than the costs incurred improves cash flow but can raise concerns about the recognition of revenue, which underwriters may discount. On the other hand, underbilling, where you bill less than the costs incurred, can point to cash flow strain and indicate that you’re financing the project owner. Underwriters typically look for a healthy balance between the two, as either extreme can signal financial trouble.
Backlog and Work-in-Progress Balance
Underwriters will also assess your backlog and WIP balance. They’re looking for Concentration Risk., whether you have a large project that could put your business at risk if it doesn’t go as planned. Having a diverse mix of projects can reduce this risk, making your business more attractive to sureties. Additionally, the total WIP should align with the amount of bonding capacity you are requesting.
Accuracy of Cost-to-Complete (CTC)
Underwriters compare your Cost-to-Complete estimates with historical accuracy. If your cost estimates are frequently off by a large margin, the underwriter may question whether your future estimates are reliable. Consistent inaccuracies in CTC can result in the underwriter placing less trust in your WIP reports, reducing your bonding capacity.
Revenue Recognition Method
The most widely accepted method for revenue recognition in the construction industry is the Percentage of Completion (POC) method. This provides the most transparency and visibility into ongoing profitability. Underwriters prefer consistency in how you apply your revenue recognition method.
Six Red Flags That Can Hurt Your Bonding Capacity
Several accounting and operational issues can negatively affect your bonding capacity. Here are the six most common red flags that underwriters look for in your WIP:
Strengthening Your WIP for Bonding Review (Practical Steps)
To improve your chances of securing better bonding terms, it’s essential to address these red flags and strengthen your WIP reporting process. Here’s how:
1. Implement Monthly WIP Discipline
Ensure that your WIP reports are submitted on time every month. Set a goal to close your books by the 10th day of the following month. Review the WIP with your project managers before submission, comparing it to the prior month and addressing any discrepancies.
2. Use Conservative Estimates
Always be cautious in your Cost-to-Complete estimates. Underwriters appreciate contractors who "under-promise and over-deliver." Having a reasonable contingency built into your projections can help mitigate the risk of over- or underestimating future costs.
3. Document Your Process
Underwriters want to see that you have a clear, documented process for your WIP reporting. This includes defining your revenue recognition methods, percentage-of-completion calculations, and having an audit trail for all significant estimates. Transparency here builds trust.
4. Reconcile WIP to Other Reports
Make sure your WIP reports are aligned with your P&L and balance sheet. If discrepancies exist due to timing or other factors, provide a clear explanation in the narrative accompanying your report. This transparency helps to establish credibility with your surety underwriter.
The Bottom Line: The Impact of Strong WIP Reporting
Strong WIP reporting can significantly increase your bonding capacity and reduce your bonding costs. On the other hand, weak reporting can reduce your bonding capacity by 20-30%, limiting your ability to compete for larger projects.
Example 1: Weak WIP Reporting (The Cost of Poor Accounting)
Contractor's Bonding Request: $5M
Result: Surety approves only $3M (40% reduction). The contractor loses out on bids totaling $500K+ in revenue because they couldn’t meet bonding requirements.
Example 2: Strong WIP Reporting (The Benefit of Discipline)
Contractor's Bonding Request: $5M
Result: Surety approves $6M (120% of the original request) and offers a lower bonding rate (1.5% vs. 2.0%).
Good WIP reporting helps you secure better bonding terms, which can result in significant savings on bonding costs potentially $25K annually and increased capacity.
Take Action Today
Your WIP is more than an accounting document; it is your company's Surety Resume. It is the single most critical factor determining your Working Capital and the level of trust the surety places in your management team.